Current works, 1 quarter 2017

Current works, 1 quarter 2017

Купить участок, дом в Одессе -                                     Current works, 1 quarter 2017

March 2017

  1. Major repair of the Central Slope.
  2. The following regular works on the cottage community area maintenance were performed during the 1th quarter:

 - daily cleaning of streets, both manual and mechanical;

- comprehensive green planting management in public areas;

- regular removal of household waste;

  1. To implement a high level of security within the cottage community territory, the following activities were carried out during the 1th quarter:

- patrolling the area;

- round-the-clock duty of mobile rapid response team;

- round-the-clock service of checkpoint;

- outdoor video surveillance of the streets and public areas of the cottage community;

- daily walk around inspection of the reserve adjacent to the cottage community in order to identify unauthorized fire sources;

- repair of the fence around the perimeter of the cottage community;

- security of the cottage community  was enhanced with two new security posts on the territory.

  1. During the 1th quarter of 2017, to ensure smooth and trouble-free operation of utilities a scheduled preventive maintenance of utilities, pumping stations and transformer substations was performed:

Gravity sewerage. Pipes were checked for clogging and maintaining the calculated slope. Blockages were removed. Sections with deviations were restored.

Force main sewerage. Sewerage was checked for integrity. Damaged pipe sections were repaired. The protected area of pressure header pipeline was inspected for deviations from the requirements of the State Building Codes of Ukraine. Sections with deviations were restored. Shutoff valves has been adjusted.

Cable power lines (10 kV). Preventive testing was carried out. Communication devices were adjusted. Supporting insulation was cleaned from dirt.

Cable power lines (0.4 kV). The resistance, ground loop and phase "0" circuit were measured. Communication equipment was adjusted. Contact groups were tightened.

Water supply system. Pressure testing was carried out to detect water leaks.

Transformer substations. Oil fill-up. Supporting insulation was cleaned. Contact groups were tightened.

Acceptance of an automated electric power metering system;

Network laying for the automatic system for commercial measurement of power consumption;
 

Cleaning the storm sewage after the winter.

Спасибо за заявку!
Мы свяжемся с Вами в ближайшее время

To order presentation

Get your invitation to visit the object (area near the sea, neck of the woods or prepared at home) in the gated community “Pine beach”

Name*:
Your phone number:
Your e-mail:
Select a convenient time for You:

*We guarantee that Your data will not be disclosed to third parties and is used only to contact You

Ask question

Name*:
Your phone number:
Your e-mail:
Your question:

*We guarantee that Your data will not be disclosed to third parties and is used only to contact You

Вверх