  1. 100 lm of balustrade on the quay were restored and painted.
  2. Taking care of our youngest residents, a new sandbox was manufactured and installed. The sandbox is equipped with a cover to protect the sand against dogs and cats. In open position the cover transforms into comfortable seats.
  3. Repair and painting of trainers located on the quay.
  4. For the purposes of beautification, at the fountain at the first scenic viewpoint a fountain composition has been installed.
  5. In the fountains at the first and second scenic viewpoints the reed was planted and fish was stocked.
  6. 30 lm of storm water grates were constructed and installed.
  7. The following regular works on the cottage community area maintenance were performed during the second quarter:

 - daily cleaning of streets, both manual and mechanical;

- comprehensive green planting management in public areas;

- regular removal of household waste.

  1. To implement a high level of security within the cottage community territory, the following activities were carried out during the second quarter:

- continuing the implementation of the project "Outdoor video surveillance of the streets and public areas of the cottage community"; Within the framework of the first phase over 15 cameras were installed and connected to the cottage community guard console.

- patrolling the area;

- round-the-clock duty of mobile rapid response team;

- round-the-clock service of checkpoint;

- outdoor video surveillance of the streets and public areas of the cottage community;

- daily walk around inspection of the reserve adjacent to the cottage community in order to identify unauthorized fire sources;

- repair of the fence around the perimeter of the cottage community.

  1. During the second quarter of 2015, to ensure smooth and trouble-free operation of utilities a scheduled preventive maintenance of utilities, pumping stations and transformer substations was performed:

Gravity sewerage - the works were performed on a section of 3,068 lm of 11,025 lm. Pipes were checked for clogging and maintaining the calculated slope. Blockages were removed. Sections with deviations were restored.

Force main sewerage - the works were performed on a section of 2,850 lm of 11,250 lm. Sewerage was checked for integrity. Damaged pipe sections were repaired. The protected area of pressure header pipeline was inspected for deviations from the requirements of the State Building Codes of Ukraine. Sections with deviations were restored. Shutoff valves has been adjusted.

Water supply system - the works were performed on a section of 4,021 lm of 14,010 lm. Pressure testing was carried out to detect water leaks.

Cable power lines (10 kV) - the works were performed on a section of 2,607 lm of 5,215 lm. Preventive testing was carried out. Communication devices were adjusted. Supporting insulation was cleaned from dirt.

Cable power lines (0.4 kV) - the works were performed on a section of 10,662 lm of 21,323 lm. The resistance, ground loop and phase "0" circuit were measured. Communication equipment was adjusted. Contact groups were tightened.

Overhead lines (10 kV) - the works were performed on a section of 525 lm of 1,935 lm. Check for branches on the line. Supporting insulation has been inspected for damage. Disconnectors were adjusted.

Transformer substations - the works were performed on 5 pcs. of 11 pcs. Oil fill-up. Supporting insulation was cleaned. Contact groups were tightened.

Sewerage pump stations - the works were performed on 5 pcs. of 13 pcs. The secondary switching networks of pump group control panel were checked.

Inspection and scheduled preventive maintenance of 645 lm of gravity sewerage in the area of:  Dzerkalna str., Horikhova str.

Inspection and scheduled preventive maintenance of SPS 1 and SPS 12 wells. The secondary switching networks of pump group control panel were checked.

Inspection and scheduled preventive maintenance of 1,335 lm of gravity sewerage in the area of:  Dzerkalna str. Aleia Heroiv str.

Water supply pipeline with a length of 1,509 lm was pressure tested to detect water leaks in the following areas: Morska and Vitrylna streets. In the same area 4 fire hydrants and 6 connection wells were inspected and all the necessary scheduled preventive maintenance works have been performed.

 

Water supply pipeline with a length of 1,756 lm was pressure tested to detect water leaks in the following areas:  Kvitkova str., Pryberezhna str., quay. In the same area 4 fire hydrants and 6 connection wells were inspected and all the necessary scheduled preventive maintenance works have been performed

Спасибо за заявку!
Мы свяжемся с Вами в ближайшее время

To order presentation

Get your invitation to visit the object (area near the sea, neck of the woods or prepared at home) in the gated community “Pine beach”

Name*:
Your phone number:
Your e-mail:
Select a convenient time for You:

*We guarantee that Your data will not be disclosed to third parties and is used only to contact You

Ask question

Name*:
Your phone number:
Your e-mail:
Your question:

*We guarantee that Your data will not be disclosed to third parties and is used only to contact You

Вверх