Shore protection works
June 2005
Due to the lack of shore protection works, the sea annually "takes away" about 1 line meters of basic plateau, and thousands of cubic meters of soil are carried away to the sea.
An expert examination of the shore showed that at the time of the beginning of shore protection works the beach zone no longer existed; clay and stony blocks go straight to the sea. The condition of the coast is catastrophic. All this creates an urgent need for shore protection work in the shortest possible time.
The initiated shore protection project was developed by the Institute “Odessa municipal services” under the guidance of the winner of the State Prize Vladimir Petrovich Kuznetsov.
Works are conducted round-the-clock.